In June 2020, the following works are being carried out at the construction site of the LUCKY LAND residential complex:
Building No. 3, Section 1:
Construction of the reinforced concrete frame of the 6th floor (ceiling above the floor) is underway;
Bricklaying of the basement and 3 floors is underway.
Building No. 3, Section 2:
Construction of the reinforced concrete frame of the 6th floor is in progress;
Bricklaying of 3 floors is underway.
Building No. 3, Section 3:
Construction of the reinforced concrete frame of 2 floors is underway.
House No. 4:
Concrete preparation for installation of the foundation slab of section 4.1 has been completed;
Preparatory work is being carried out for the installation of concrete preparation under the foundation slab of section 4.2;
Opening of the pit of section 4.3 continues.