In May 2020, the following works are being carried out at the construction site of the LUCKY LAND residential complex:
Building No. 3, Section 1:
Construction of the reinforced concrete frame of the 4th floor is underway.
Building No. 3, Section 2:
Construction of the reinforced concrete frame of the 4th floor is underway.
Building No. 3, Section 3:
Construction of the reinforced concrete frame of the basement floor is underway.
House No. 4: Excavation work is in progress.