In November 2020, the following works are being carried out at the construction site of the LUCKY LAND residential complex:

Building No. 3, Section 1:

Finished work on the arrangement of the wooden frame.

Work is underway to arrange the brickwork of the 6th to 13th floors.

Work is underway to arrange the staircases on the 13th floor.

Installation of ventilation units is completed.

 

Building No. 3, Section 2:

Finished work on the arrangement of the wooden frame.

Work is underway to arrange the brickwork of the 11th floor.

Installation of staircases is completed.

Installation of ventilation units is completed.

 

Building No. 3, Section 3:

Finished work on the arrangement of the wooden frame.

Work is underway to arrange the brickwork of the 7th floor.

Work is underway to arrange the staircases on the 13th floor.

Ventilation units have been installed on the 7th floor.

 

Building No. 4, Section 1:

Work is underway to arrange the floor slab of the 2nd floor.

 

Building No. 4, Section 2:

Work is underway to arrange the vertical elements of the 1st floor.