Moving Forward – October Highlights

At Building No. 4, we have completed the lobby wall finishes in Sections 1 and 3, while façade and electrical installation works, as well as landscaping, are ongoing. At Building No. 6, we are continuing façade works, while window installation is underway at Building No. 5. At the same time, we are developing the utility networks and constructing the children's playground in the courtyard.

Here is a breakdown of the progress by section.

Building No. 4, Section 1

  • Completed the lobby wall finishes with porcelain stoneware.
  • Completed the wall finishes in the common areas on the 2nd floor.

Building No. 4, Section 2

  • Continuing the installation of LMМ façades and terrace railings on the 3rd and 9th floors.
  • Carrying out electrical installation works in the common areas. Electrical works inside the apartments have already been completed.

Building No. 4, Section 3

  • Completed the lobby wall finishes with porcelain stoneware.
  • Landscaping around Building No. 4 is 20% complete.

Building No. 6, Section 1

  • Continuing façade installation works.
  • Painting of the surfaces beneath the clinker finish is 40% complete.
  • Completed wall masonry.

Building No. 6, Section 2

  • Completed the installation of doors in the unheated connecting corridors.
  • Completed screed installation up to and including the 13th floor.
  • Completed wall masonry.

Building No. 5

  • In Section 3, window installation from the 3rd to the 13th floor is 95% complete.
  • In Section 2, window installation has started on floors 3 to 6.

Courtyard

  • Installed the K-1 sewage network and sewage outlets from Building No. 6.
  • Completed the water supply pipe connection to Building No. 6.
  • Completed concrete works on the children's playground slide structure.

Each of these stages gradually shapes a space for future living – from beautifully finished lobbies to essential utilities and dedicated play areas for children. We continue working and sharing the latest developments from the construction site with you.