A136 Highlight Tower
Construction progress for June 2023

21.06.2023

Go back

A136 Highlight Tower by DIM is under construction. At the finish of monolithic works. Installation work on facade systems, glazing, laying of internal networks is actively underway. The floor slab of the 32nd floor has been installed - 100%. 100% of the vertical elements of the walls and columns on the 32nd floor have been installed. Stairs to the 31st floor have been installed. Ventilation units up to the 28th floor have been installed. Brickwork from the 16th to the 27th floor has been completed - 55%. The floor screed on the 8th floor has been completed - 100%. The floor screed on the 9th floor has been completed - 65%. Completed plumbing works from -2 to 27th floor - 30%. Electrical installation works from -2nd to 27th floor have been completed - 40%. 87% of double-glazed units of stained-glass systems from the 6th to the 15th floor have been installed. 95% of SPOK stained glass systems from the 1st to the 4th floor have been installed. 85% of the double-glazed windows of the stained-glass systems from the 1st to the 4th floor have been installed. 30% of the cladding of the stylobate facade has been arranged (insulation, subsystem installation of decorative stone "Travertine"). The installation of the hinged ventilated facade from the 5th to the 15th floor has been completed - 70%. Preparatory work on the lighting of the facade of the 5th-15th floor has been completed - 25%.