Construction Progress – July 2026
03.08.2026
The final stages of A136 Highlight Tower are focused on the details that shape residents' everyday experience.
Throughout July, work continued on interior finishing, installation of engineering systems, landscaping, and preparation of the building's key areas.
These finishing touches are what create the tower's seamless living environment — from the very first step into the lobby to the everyday use of every space.
Installation of lighting fixtures in the elevator lobbies on Floors 25–33.
Completion of ceramic tile finishing around the elevator door surrounds.
Installation of elevator floor indicator signage.
Completion of the ventilated ceramic tile façade on the podium level within the inner courtyard.
Installation of granite paving at the pedestrian area of the main entrance.
Preparation of the access ramp for the application of a polymer surface coating.
Connection of the parking garage ventilation systems.
Connection of the fire alarm system (FAS) equipment.
Installation of decorative metal floor indicator panels.
Reconstruction of air ducts in the parking garage.
Connection of electrical cables.
Demolition of the temporary annex on the school grounds.
Completion of granite paving at the parking garage entrance.
Concrete base preparation for the school annex.
Connection of lighting fixtures in the common areas.
Commissioning of the façade lighting system.
Installation of the elevator control cabinet.
Installation of screed level guides for self-leveling compound application.
Installation of smoke extraction ductwork on Floor 34.
Floor cleaning on Floor 31.
Installation of the automatic irrigation system.
Installation of smoke extraction system control panels in the parking garage.
Commissioning of the fountain equipment system.
Installation of lighting fixtures at the parking garage entrance.