THE ONE construction results for August:
- waterproofing works
- more than 60% of works on the construction of the fence
- a full cycle of measures to strengthen the sheet pile fence
- works on the construction of a pit for pouring the foundation slab of the left stylobate
- installation of more than 30 piles of the main pile field
- removal of more than 5000 cubic meters soil