THE ONE construction results for August:

  • waterproofing works
  • more than 60% of works on the construction of the fence
  • a full cycle of measures to strengthen the sheet pile fence
  • works on the construction of a pit for pouring the foundation slab of the left stylobate
  • installation of more than 30 piles of the main pile field
  • removal of more than 5000 cubic meters soil